Old back-boiler and tiled fireplace rip-outs

Ripping out a standard tiled or concrete fireplace costs €200 to €450. Where a cast-iron wet back boiler sits inside the opening, draining gravity heating pipes, removing the heavy boiler box and rebuilding the chamber runs €650 to €1,400.

What hides behind 1960s to 1980s Irish tiled surrounds, draining redundant wet back boilers safely and making brick breasts ready for new stone.

Free, no obligation. One local installer prices it, not five.

  • €200–€450standard tiled rip-out
  • €650–€1,400wet back-boiler removal
  • €250–€600breast bonding & skim
  • Drain firstnever seal wet boiler pipes
Mason trowelling mortar onto concrete blocks during residential builders opening and hearth work

Why legacy Irish back boilers need careful disconnection

Tens of thousands of Irish semi-detached houses and bungalows built between the 1950s and late 1980s had cast-iron open-fire back boilers linked by gravity copper pipes to the hot-water cylinder and upstairs radiators. Even when a homeowner later upgraded to oil, gas or a heat pump, old back-boiler units were often left buried behind a tiled fireback.

  1. Confirm whether pipes are still wet or looped. A sealed back boiler trapped with residual water inside can turn into a dangerous steam vessel if a new fire is lit near it.
  2. Drain, cut back and cap heating pipes cleanly. Flow and return copper feeds are drained down, isolated cleanly outside the heat zone and re-balanced so existing radiators continue circulating properly.
  3. Break out concrete hearth build-ups carefully. Heavy 1970s concrete tile hearths sit tight into floor screeds and often require careful kango chiselling without shattering adjacent timber floorboards.
  4. Make good the brick recess and wall face. Rebuilding damaged jamb bricks, fitting a fresh lintel if widening the opening and skimming lime or gypsum plaster leaves a dead-flat wall for new stone.

Price my fireplace

Four taps reveal an Irish fireplace guide before any phone number is requested. One local installer rings you, not five.

Fireplace removal and chimney breast work into a Class 1 brick chimney, supplied and fitted with old fireplace removal: €1,300 to €3,200.

Step 1 of 5

What fireplace work do you want priced?

Tap the closest match. The installer checks dimensions in person.

How these fireplace figures are worked out

Supply-and-fit bands reflect typical Irish pricing for marble, Portuguese limestone, cast-iron, gas or solid-fuel suites fitted into a sound opening, including bedding the hearth and sealing slips. Gas options allow for an RGII installer, soundness testing and a Declaration of Conformance. Fit-only figures cover skilled installation labour, hearth slabbing and making good when you supply your own mantel and hearth. Old back-boiler plumbing removal, structural RSJ beams, chimney relining and bespoke plastering depend on what lies behind the plaster and are priced once inspected.

Preparing the room for a messy rip-out day

  • Clear carpets, rugs and soft furnishings. Removing old tiled surrounds and soot-packed rubble creates fine dark dust even with dust sheets and extraction vacuums.
  • Confirm rubble disposal on the written quote. An old tiled hearth, concrete base and cast-iron back boiler easily weigh over 250 kg of mixed masonry and metal waste.
  • Check whether an old gas poker pipe sits under the hearth. Many older Dublin and Cork houses had a live gas poker supply tucked beside the hearth; only an RGI can cap it.

For full chimney breast demolition, read fireplace removal and chimney breast rebuilding.

Answers before the hearth goes in

How much does it cost to remove an old back-boiler fireplace in Ireland?

Draining and disconnecting the back boiler, removing the cast unit and old surround, clearing rubble and preparing the recess typically costs €650 to €1,400.

Can a new marble fireplace go straight over an old disused back boiler?

No. Leaving a dormant cast-iron boiler behind a new fireback risks steam pressure hazards if any water remains, wastes chamber depth and hinders proper flue draw.

How long does a tiled fireplace and back-boiler rip-out take?

Stripping the old suite, disconnecting pipework and clearing masonry normally takes one day, with plastering or new surround fitting following on day two.

Does removing a back boiler affect my main gas or oil boiler?

Not once a plumber isolates and loops the redundant flow and return lines neatly and re-pressurises or vents the remaining radiator circuit.

Every Irish fireplace guide on this site

Honed cream limestone fireplace surround with stepped mantel, hearth and glowing inset fire on a pale plastered wall

Check your fireplace price before anyone calls

Choose the surround style, chimney situation and supply or fit-only scope. One written quote comes back from a single fireplace installer in your county.