Fireplace removal and chimney breast rebuilding
Ripping out an old fireplace surround and disposing of rubble runs €200 to €450, rising to €650 to €1,400 with a legacy back boiler. Removing a ground-floor chimney breast with steel support runs €1,300 to €2,400, and full-height breast and roof stack removal runs €2,800 to €4,800.
Stripping outdated tiled suites, opening up brick breasts cleanly, supporting upper masonry with steel and plastering walls flush.
Free, no obligation. One local installer prices it, not five.
- €200–€450old surround rip-out & disposal
- €1,300–€2,400ground-floor breast removal
- €2,800–€4,800full breast & roof stack
- €300–€650structural engineer sign-off

Three levels of chimney breast alteration compared
Rip-out & blank off opening
- Typical Irish cost
- €450 to €950
- Key structural & venting steps
- Remove suite, sweep soot, cap roof pot with vented cowl and fit a low hit-and-miss room vent.
Ground-floor breast removal only
- Typical Irish cost
- €1,300 to €2,400
- Key structural & venting steps
- Acrow props, structural engineer RSJ steel beam into load-bearing walls to carry upstairs masonry.
Full removal from ground to roof
- Typical Irish cost
- €2,800 to €4,800
- Key structural & venting steps
- Scaffolding, dismantle roof stack, refelt and slate roof cleanly, clear breasts on both floors.
Never knock out a ground-floor chimney breast and leave the upstairs brickwork resting on floorboards or gallows brackets bolted into weak hollow blockwork. An Irish chartered structural engineer inspects the party wall thickness, specifies a steel beam bearing onto padstones and signs off the support for future property sale queries.
Price my fireplace
Four taps reveal an Irish fireplace guide before any phone number is requested. One local installer rings you, not five.
Fireplace removal and chimney breast work with no active chimney flue, supplied and fitted: €1,300 to €3,800.
How these fireplace figures are worked out
Supply-and-fit bands reflect typical Irish pricing for marble, Portuguese limestone, cast-iron, gas or solid-fuel suites fitted into a sound opening, including bedding the hearth and sealing slips. Gas options allow for an RGII installer, soundness testing and a Declaration of Conformance. Fit-only figures cover skilled installation labour, hearth slabbing and making good when you supply your own mantel and hearth. Old back-boiler plumbing removal, structural RSJ beams, chimney relining and bespoke plastering depend on what lies behind the plaster and are priced once inspected.
Preventing damp salt staining after closing a chimney
- Sweep soot thoroughly before blocking up. Trapped chimney soot holds hygroscopic salts that pull moisture straight through fresh pink skim plaster, leaving brown tide marks within months.
- Vent the dead flue at top and bottom. Fit a vented rain cowl on the chimney pot and a discreet air brick or hit-and-miss louvre in the sealed recess so air circulates inside the stack.
- Use lime-free or salt-resistant render on old breasts. Applying a specialist renovating backing coat over soot-stained brickwork stops tar bleed before final skimming.
- Check shared party-wall chimneys first. In semi-detached and terraced Irish houses, your neighbour's flue shares the same masonry spine; notify them before starting structural work.
If an old wet back boiler sits inside the opening, read old back-boiler and tiled fireplace rip-outs first.
More Irish fireplace guides
Back-boiler & tiled rip-outsDraining legacy pipework, breaking concrete hearths and making walls sound.
Builders' openings & sizesStandard 16-inch and 18-inch openings, mantel rebates and hearth widths.
Hole-in-the-wall suitesFrameless recessed gas and linear fireplace suites framed flush in plaster.
Fireplace installation costsComplete Irish supply-and-fit and fit-only price guide by fireplace type.
Dublin & Leinster fireplacesGeorgian and Victorian townhouses, suburban precast flues and gas estates.
VAT rates & fitting scheduleRevenue's two-thirds rule for 13.5% vs 23% VAT and stone quarry lead times.Answers before the hearth goes in
How much does removing a chimney breast cost in Ireland?
Taking out a ground-floor breast with steel beam support typically runs €1,300 to €2,400, plus €300 to €650 for structural calculations. Full-height removal including the roof stack runs €2,800 to €4,800.
Can I remove a chimney breast in a semi-detached house?
Usually yes on your own side of the party spine, provided a structural engineer designs proper support for any retained stack above and your neighbour's flues remain sealed and untouched.
Do I need planning permission to take down a roof chimney stack?
Internal breast removal normally needs no planning permission on non-protected homes. Altering the external roofline on a Protected Structure or Architectural Conservation Area requires council consent.
Why do brown patches appear on plastered-over fireplaces?
Old soot deposits contain sulphate and nitrate salts that draw damp through gypsum plaster unless swept clean, lined with salt-retardant render and vented.
Every Irish fireplace guide on this site
Surrounds & fires
Regs, flues & prep

Check your fireplace price before anyone calls
Choose the surround style, chimney situation and supply or fit-only scope. One written quote comes back from a single fireplace installer in your county.
