Irish VAT rates and fireplace fitting timelines

Buying a surround, hearth or gas fire supply-only carries 23% VAT. Permanently fitted fireplace installations qualify for 13.5% VAT under Revenue's two-thirds rule only when the net material cost stays at or under two-thirds of the VAT-exclusive bill. Stock marble, limestone or cast-iron surrounds are normally fitted within 1 to 3 weeks, taking 1 day on site. Gas suites and chimney breast alterations run 2 to 5 weeks, while bespoke carved stone takes 4 to 8 weeks.

How Revenue's two-thirds rule decides 13.5% versus 23% VAT on supply-and-fit suites, plus realistic lead times from survey to first fire.

Free, no obligation. One local installer prices it, not five.

  • 13.5%VAT on fit-only & qualifying builds
  • 23%VAT on supply-only & >2/3 goods
  • 1–3 wksstock surround lead time
  • 4–8 wksbespoke carved stone lead
Pale stone and lime-plaster chimney breast with clean-lined fireplace surround and recessed black hearth opening

How Revenue's two-thirds VAT rule applies to fireplaces

13.5% reduced VAT rate

Supply-only surround or fire
Never applies
Fit-only installation labour
Yes, building service rate
Supply-and-fit full suite
Only if net goods <= 2/3 of net total
Chimney breast rebuild & labour
Yes when labour exceeds 1/3

23% standard VAT rate

Supply-only surround or fire
Always 23% at point of purchase
Fit-only installation labour
Only if customer buys stone separately (stone stays 23%)
Supply-and-fit full suite
Applies to whole bill if net goods > 2/3 of net total
Chimney breast rebuild & labour
Only if high-ticket fire pushes goods over 2/3

Under Revenue's two-thirds rule, if a high-end marble surround and balanced-flue gas fire make up 72% of the VAT-exclusive contract and fitting labour is 28%, the entire supply-and-fit invoice must legally be charged at 23% VAT. By contrast, labour-heavy jobs such as fit-only installations, back-boiler removals and chimney breast structural rebuilds generally qualify for 13.5% VAT.

Price my fireplace

Four taps reveal an Irish fireplace guide before any phone number is requested. One local installer rings you, not five.

A marble or limestone fireplace surround into a Class 1 brick chimney, supplied and fitted: €2,100 to €4,400.

Step 1 of 5

What fireplace work do you want priced?

Tap the closest match. The installer checks dimensions in person.

How these fireplace figures are worked out

Supply-and-fit bands reflect typical Irish pricing for marble, Portuguese limestone, cast-iron, gas or solid-fuel suites fitted into a sound opening, including bedding the hearth and sealing slips. Gas options allow for an RGII installer, soundness testing and a Declaration of Conformance. Fit-only figures cover skilled installation labour, hearth slabbing and making good when you supply your own mantel and hearth. Old back-boiler plumbing removal, structural RSJ beams, chimney relining and bespoke plastering depend on what lies behind the plaster and are priced once inspected.

Realistic lead times from survey to first lighting

Stock limestone, marble or cast iron

1 to 3 weeks

Held in Irish warehouses; fitted over 1 day once the chimney survey is signed off.

Gas fire & balanced-flue suites

2 to 5 weeks

Allows ordering the exact coaxial flue kit, scheduling the RGI and plaster making good.

Bespoke carved stone & custom hearths

4 to 8 weeks

Custom Kilkenny limestone, Carrara marble or made-to-measure hearth slabbing cut to order.

Allow an extra 7 to 14 days of gentle curing after heavy mortar, vermiculite backfill or lime plastering before building full winter fires. See full Irish fireplace prices.

Answers before the hearth goes in

Why did one fireplace quote charge 13.5% VAT and another charge 23%?

Under Revenue's two-thirds rule, when the net cost of the marble surround and fire exceeds two-thirds of the net invoice, the full supply-and-fit contract moves to 23% VAT. Heavy labour or breast-rebuild jobs often remain at 13.5%.

If I buy my surround separately and pay a fitter, what VAT do I pay?

You pay 23% VAT on the fireplace at the showroom and 13.5% VAT on the separate fit-only labour invoice.

How long does installation take inside the house?

A clean surround swap takes 1 day. Gas suites with balanced-flue coring take 1 to 2 days, and chimney breast rebuilds run 2 to 4 days.

When is the quietest time of year to book an Irish fireplace installer?

Spring and summer slots typically carry shorter wait times (1 to 3 weeks), whereas October through December schedules fill quickly ahead of winter cold snaps.

Every Irish fireplace guide on this site

Honed cream limestone fireplace surround with stepped mantel, hearth and glowing inset fire on a pale plastered wall

Check your fireplace price before anyone calls

Choose the surround style, chimney situation and supply or fit-only scope. One written quote comes back from a single fireplace installer in your county.